Menu
Sales@jumeirahindustry.com +8616601237081
Language

Modular Container House

This mine‑spec knock‑down modular container house is built for remote mining camps. It features industrial fluorocarbon‑painted aluminum cladding and full bolt‑on knock‑down construction for 40HQ sea export. All fancy glamping decorations are removed. Upgraded with anti‑stone windows, heavy‑duty dust sealing and mine‑grade fire safety. On‑site bolt‑only assembly with no welding. Ideal for fixed‑base worker dorms and site offices.

  • - **Mine‑grade Bolt‑Assembly Structure**
  • Hot‑dip galvanized steel frame, fluorocarbon aluminum cladding for harsh mine conditions.
  • - **Anti‑Dust & Anti‑Impact Protection**
  • Small windows with steel anti‑stone grilles and multi‑layer dust‑proof gaskets.
  • - **40HQ Knock‑Down Export Solution**
  • Fully disassembled for standard container shipping, cutting overseas freight cost.
  • - **Heavy‑Duty Mine‑Focused Interior**
  • Metal bunk beds, robust lockers, wear‑resistant floor, no luxury decorative fittings.
  • - **Mine HSE Fire‑Safety Compliance**
  • Flame‑retardant materials, smoke & heat alarms, mine‑standard electrical wiring.
  • - **Rapid Weld‑Free On‑Site Setup**
  • 2‑3 workers finish assembly within 6‑8 hours with only bolt tools.
Contact Us

Mine‑Spec Knock‑Down Modular Container House

This knock‑down modular container house is re‑engineered for remote mining camp deployment. Derived from mature commercial modular housing platform, all fancy glamping decorative trims, ambient light strips and large panoramic glass are removed. The unit adopts full bolt‑assembly knock‑down design, all components can be disassembled and packed inside standard 40HQ shipping container for low‑cost international ocean freight. On‑site erection only requires bolt connection without on‑site welding. Optimized for anti‑dust, anti‑sandstorm, impact‑resistance and mine‑level fire safety, it serves as worker dormitory, site office, meeting room or on‑site storage room for long‑term fixed mine base camp. Not designed for towing or frequent relocation between mining working faces.

Technical Parameters (Metric & Imperial)

Item Mine‑Spec Knock‑Down Modular Unit
External Overall Dimension (Assembled) 6000mm(L) × 2400mm(W) × 2800mm(H)
19.7ft(L) × 7.9ft(W) × 9.2ft(H)
Internal Usable Dimension 5450mm(L) × 2100mm(W) × 2300mm(H)
17.9ft(L) × 6.9ft(W) × 7.5ft(H)
Main Frame Hot‑dip galvanized heavy‑duty steel frame, multiple crane lifting lugs for hoisting
Outer Wall Cladding Industrial fluorocarbon painted aluminum panel (non‑aviation grade), UV‑resistant, anti‑corrosion, easy dust washing
Insulation Wall & Roof:100mm closed‑cell PU foam; Floor:50mm PU foam with moisture‑proof barrier
Window (Mine‑spec) Reduced‑size double‑glazed tempered glass, external steel anti‑flying‑stone protective grille, heavy‑duty dust‑proof rubber gasket
Entry Door Reinforced steel security door, multi‑layer dust‑sealing system, no decorative light fittings
Total Weight (fully assembled) Approx. 6.3 Ton
Shipping Solution Knock‑down kit, all components disassembled and packed into single 40HQ container for international export
On‑site Installation Pure bolt assembly, zero on‑site welding; simple steel pier / spot concrete foundation required
Water System Pre‑fabricated pipeline; optional on‑board fresh water, grey‑water and black‑water tanks for off‑grid mine location
Power System Mine‑grade pre‑wired electrical circuit complying with AS/NZS 3000; optional rooftop solar mounting frame + 48V LiFePO4 off‑grid power kit
Typical Mine Interior Layout 2‑4 persons metal bunk beds, heavy‑duty steel lockers, high‑wear‑resistant SPC flooring, compact wet‑dry separated bathroom; remove all glamping furniture, smart curtains, projectors and decorative soft furnishings

Mine‑Grade Protection, Anti‑Dust & Fire Safety Performance

🔹 Anti‑Dust & Sand‑Storm Protection

  • Full‑perimeter multi‑layer heavy‑duty rubber gaskets for all doors and windows, block fine mine dust and sand particle ingress under open‑pit mine environment.
  • Smooth fluorocarbon aluminum outer panel, dust can be washed away directly by high‑pressure water, low maintenance workload.
  • All external cable holes and pipe penetration points adopt dust‑proof sealing sleeves to avoid dust leakage.
  • Small‑size windows with external steel anti‑stone grille reduce exposed glass area, prevent sand‑blast and flying rock fragment damage.

🔹 Impact & Corrosion Protection

  • Hot‑dip galvanized steel main frame against rust for long‑term field service life.
  • Industrial fluorocarbon painted aluminum cladding provides excellent UV‑resistance and salt‑spray resistance, suitable for desert, plateau and coastal salt‑lake mine sites.
  • Exposed corners reinforced by steel corner protectors to resist daily knock and collision during mine operation.

🔹 Mine HSE Fire‑Safety Standard

  • Interior wall & ceiling adopt low‑flame‑retardant materials, no highly‑flammable decorative soft materials.
  • Pre‑installed smoke detector, heat alarm and ABC dry‑powder fire extinguisher inside each unit, satisfy mine HSE requirements.
  • Mine‑grade isolated electrical wiring, earth‑fault safety cut‑off protection, reduce fire risk caused by dust‑polluted circuit.
  • Fire‑safety material test reports are available for mine tender submission.

Core Advantages

  • Knock‑Down Bolt‑Assembly For Global Sea‑Freight
    All structural parts can be fully disassembled and loaded inside standard 40HQ container, solve over‑width shipping problem for overseas mining projects; on‑site bolt connection without welding work.
  • Mine‑Oriented Simplified Configuration, No Fancy Decorations
    Cancel all glamping‑style light strips, large panorama glass and luxury soft furnishing. Configure heavy‑duty bunk beds and metal lockers for miner heavy‑daily‑use scenario.
  • Strong Anti‑Dust, Anti‑Sandstorm & Anti‑Corrosion Capacity
    Multi‑layer door‑window dust‑sealing system, fluorocarbon anti‑corrosion outer cladding and anti‑flying‑stone window grille, adapt harsh open‑pit mine desert environment.
  • Complete Mine‑Level Fire‑Safety & HSE Compliance
    Flame‑retardant interior materials, smoke & heat alarm, mine‑grade isolated electrical wiring, supporting documents available for mine project bidding.
  • Flexible Multi‑Scenario Combination Deployment
    Single unit for dorm or office; multiple units can be combined side‑by‑side to build large‑scale worker accommodation camp cluster, match fixed‑base mine camp planning.

FAQ

Q1: Can this knock‑down modular house be towed and moved frequently on mine haul roads?

A: No. This unit is designed for crane‑lifted fixed‑base deployment without towing chassis. If you need mobile housing for frequently‑shifted working faces, please select our ADR‑certified off‑road caravan series.

Q2: What foundation do I need to prepare on mine‑site?

A: Simple steel support piers or spot concrete point foundations are sufficient. Complex large‑scale civil‑work construction is not required.

Q3: How long does on‑site assembly take after knock‑down kit arrives?

A: 2‑3 skilled workers can finish assembly within 6‑8 hours per unit, only bolt tools are needed, no welding machine required.

Q4: Is it suitable for heavy‑dust open‑pit desert mine?

A: Yes. After mine‑spec upgrade: reinforced dust‑proof gaskets, anti‑stone window grille and sealed cable penetration design effectively block mine fine dust ingress. Outer fluorocarbon panel is easy for regular high‑pressure washing maintenance.

Q5: Can we install off‑grid solar‑battery power system for remote mine without public grid?

A: Yes. Solar mounting brackets, battery compartment and pre‑wiring are reserved inside the unit for off‑grid power‑supply solution.

Q6: Can I still use the original glamping version for mining camp directly?

A: Not recommended. Original glamping version uses large panorama glass, weak dust‑sealing and luxury soft interior, which will be easily damaged under mine harsh environment. Mine‑spec modification is mandatory for mining‑site application.

Q7: What technical documents can you provide for mine tender?

A: We can supply steel material report, thermal insulation R‑value data, fire‑retardant material test report, salt‑spray test report and structure calculation document for project submission.

Get in touch

Have a project in mind ? Send us your ore assay report, mine location and target capacity. Our mining engineers will prepare a customized process design, equipment list and quotation within 48 hours.

Please enable JavaScript in your browser to complete this form.
+8616601237081

Chat on WhatsApp

Sales@jumeirahindustry.com

Send Email