Menu
Sales@jumeirahindustry.com +8616601237081
Language

Off-Road Caravan | Modular Mobile Accommodation for Mining Site

Our ADR-compliant off-road caravan is a heavy-duty hard-shell mobile accommodation unit engineered for remote mining and field operation sites. Built with reinforced off-road chassis, high-performance thermal insulation and complete self-contained water & off-grid power systems. It serves as relocatable worker dormitories or site offices, adapted to extreme high/low temperature, dusty and harsh unpaved working environments.

  • - **Heavy-Duty Reinforced Off-Road Chassis**
  • High ground clearance & independent suspension to traverse rough, unpaved mine access roads.
  • - **Hard-shell Fully Insulated & Dustproof Body**
  • Multi-layer thermal insulation, sealed enclosure to withstand extreme temperature and heavy dust.
  • - **Complete Self-contained Off-Grid Living System**
  • Integrated water tanks, rooftop solar and lithium battery for autonomous remote site operation.
  • - **ADR Compliant & Customizable Interior Layout**
  • Australian ADR ready, flexible design for worker bunk dorm or on-site site office.
Contact Us

Off-Road Caravan | Modular Mobile Accommodation for Mining Site

Our ADR certified off-road caravan is a factory prefabricated mobile accommodation unit specially designed for remote open-pit mining sites and field mobile operations. Built with heavy-duty off-road chassis, reinforced body structure, full thermal insulation, complete water-sewage and off-grid power system. It can be towed and relocated to different working zones quickly, serving as worker dormitory, site office, control room or field rest room. Fully compliant with Australian ADR road & safety regulations for mining camp deployment.

Dimension & Technical Parameters (Metric & Imperial / Feet)

Item Compact Model (Recommended, 2 units fit in one 40HQ) Standard Medium Model (1 unit per 40HQ)
External Overall Dimension 5400mm(L) × 2200mm(W) × 2600mm(H)
17.7ft (L) × 7.2ft (W) × 8.5ft (H)
6400mm(L) × 2250mm(W) × 2800mm(H)
21.0ft (L) ×7.4ft (W) ×9.2ft (H)
Internal Usable Size 4600mm(L) ×1950mm(W) ×1950mm(H)
15.1ft (L) ×6.4ft (W) ×6.4ft (H)
5500mm(L) ×2000mm(W) ×1980mm(H)
18.0ft (L) ×6.6ft (W) ×6.5ft (H)
Chassis & Suspension Q355 hot galvanized heavy duty chassis, independent off-road suspension, single axle Q355 hot galvanized heavy duty chassis, independent off-road suspension, tandem axle optional
Ground Clearance ≥280mm / 0.92ft, rough unpaved mine road ≥300mm / 0.98ft, rough unpaved mine road
Tare Weight / ATM Tare: ~1850kg; ATM:2800kg Tare: ~2200kg; ATM:3200kg
Tyres 15″ LT mud terrain off-road tires 16″ LT mud terrain off-road tires
Fresh Water Tank 120L / 31.7gal 140L / 37gal
Grey / Black Water Tank Grey 100L, Black 70L Grey120L, Black80L
Off-grid Power System 48V LiFePO4 battery, 600W solar panel, pure sine inverter, MPPT 48V LiFePO4 battery, 800W solar panel, pure sine inverter, MPPT
Typical Layout 2–3 berth worker dorm, compact wet bathroom, lockers 3–4 berth worker dorm, wet bathroom, storage & workbench

Thermal Insulation & Harsh Environment Adaptation

  • Wall: 75mm closed-cell XPS foam insulated fiberglass sandwich panel; Roof: 100mm thick insulation layer, reduce heat transfer in hot desert mining area
  • Floor: 50mm insulated structure with moisture barrier, prevent condensation and ground cold transfer
  • Windows: Double glazed insulated tempered glass, dustproof rubber sealing all around
  • Working ambient temperature: -20℃ ~ +55℃, support both high-temperature desert mine and cold plateau mine
  • Dust & sand protection: Full perimeter heavy-duty rubber seal; all external cabinet doors with dust-proof gaskets
  • Coastal mine upgrade option: SUS316 hardware, anti-salt spray coating to resist sea salt corrosion

Compliance & Certification Matters

  • Australian ADR compliance: braking system, lighting, chassis, towing coupling, electrical and gas system meet ADR requirements for road registration
  • Electrical: AS/NZS 3000 wiring standard, isolated protection, earth fault safety cut-off
  • Gas system: AGA certified gas components, flame failure protection device for LPG system
  • Fire safety: Smoke detector, heat alarm, fire extinguisher, low flammability interior lining for mining HSE requirement
  • Documents: VIN plate, test reports, FAT inspection record, certificate of compliance available for mine tender submission

Core Advantages

  • Optimized Size for Container Shipment
    Compact model allows 2 units loaded in one 40HQ container, greatly cut ocean freight cost for bulk mine camp project.
  • Rugged Off-road Mobility for Mining Site
    Heavy-duty independent suspension and high ground clearance, easy to tow and relocate between different mining working faces.
  • Complete Off-grid Living Package
    Integrated water tanks, sewage management, solar & lithium power system, self-sustained operation without external utility connection.
  • ADR Certified & Customizable Layout
    Australian ADR road compliant, flexible internal modification to multi-bed worker dorm, site office or field control cabin.

FAQ

Q1: Can two compact caravans fit inside one 40HQ shipping container?

A: Yes. Our compact model dimension is optimized. Two units can be loaded into a single 40HQ container, lowering per-unit sea freight for bulk mine camp orders.

Q2: Can this caravan be moved frequently between mining working zones?

A: Yes. Equipped with reinforced off-road chassis and independent suspension. It can be towed by heavy 4×4 vehicle on unpaved mine haul roads and relocated quickly as mining operation advances.

Q3: How is the thermal insulation performance for hot desert mine?

A: 100mm roof insulation +75mm wall XPS foam insulation, double glazed windows. It greatly reduces heat ingress. Paired with rooftop air conditioner to keep comfortable indoor temperature under +55℃ ambient condition.

Q4: What compliance documents can you supply for Australian mine project?

A: ADR compliance documents, AS/NZS electrical certification, AGA gas safety certificate, VIN plate, FAT test reports and operation manual, ready for mine tender and registration.

Q5: Can we customize internal layout as worker dormitory?

A: Yes. We can redesign the interior into multi-berth dorm with bunk beds, personal lockers, separated wet bathroom, storage and workbench according to mine camp requirement.

Q6: What is the lead time for production?

A: Standard compact unit 5–7 weeks; medium model 6–8 weeks, longer lead time required for fully customized layout and special corrosion upgrade.

Get in touch

Have a project in mind ? Send us your ore assay report, mine location and target capacity. Our mining engineers will prepare a customized process design, equipment list and quotation within 48 hours.

Please enable JavaScript in your browser to complete this form.
+8616601237081

Chat on WhatsApp

Sales@jumeirahindustry.com

Send Email